Secure Lt Ct Meter Connection Diagram. Run a piece of wire through the high side of the ct window and momentarily make contact with the positive end of the 9 volt battery to the h1 side sometimes marked with a dot and the negative end to the h2 side. Fig 4 2 1 meter with terminal cover removed 5 connection diagram fig 5 1 ct connection.
Meter installation manual hxe310 10 18 fig 5 2 ct pt connection 6 dimension. Kannect engineers private limited offering secure three lt ct operated meter model name number. Showing wiring from a current transformer in a cabinet to th.
Meter installation manual hxe310 10 18 fig 5 2 ct pt connection 6 dimension.
Ct current transformer wiring connections for commercial form 9s electric meter installation. Ht high tension energy meters. Get contact details and address id. Fig 4 2 1 meter with terminal cover removed 5 connection diagram fig 5 1 ct connection.